Choosing a TMS in Mexico is not buying the longest catalog. It is deciding who will execute your freight daily: quote, track, gather evidence, and audit before pay. This checklist is short on purpose.

points to evaluate any TMS
12
minimum pilot with metrics
6-8 wk
typical recovery if you audit 100%
5-7%

Coming from Excel? Start with TMS vs Excel. Useful buying question: licenses or finished work? Cross this list with the 7 best TMS and 1:1 comparisons.

Who this checklist is for

Shippers and 3PLs on the Mexico–US corridor with meaningful volume (reference: 300+ shipments/month).

If you are a carrier with own fleet, prioritize settlements, shop, and stamping. This list still helps, but the "winner" is often a different product.

Before demos: 4 decisions

  1. Role

    Do you buy freight or run a fleet?

  2. Modes

    Road only or multimodal?

  3. Stack

    Does the current ERP/TMS stay or get replaced?

  4. Success

    Hours, OTIF, or MXN recovered?

12-point TMS selection checklist

Elige un paso para ver el detalle

Detalle del paso · 01

Role

Fits shipper/3PL vs carrier.

Questions to ask in the demo

QuestionWeak answerStrong answer
Who captures the trip?“The user”Agent or automation with evidence
How do you audit invoices?“Reporting module”100% pre-pay match
Carta Porte?“Can be configured”Clear issue or verify flow
What if there is no API?“Phase 2”Computer use / portal / GPS mirror
What do you measure in pilot?“Satisfaction”Hours, coverage, 5-7% MXN

How to structure the pilot (6-8 weeks)

  1. One lane, customer, or mode (e.g. export truck).
  2. Week-0 baseline: hours, % audited, known leakage.
  3. Business rules: rate card, geofence, document checklist.
  4. Weekly review with tower + AP; scale decision in week 6-8.
Key takeaways5 points
  1. Choose by role: shipper/3PL vs carrier with fleet.
  2. Demand execution (quote, track, audit), not pretty screens only.
  3. In Mexico: CFDI + Carta Porte 3.1 on the correct side (issue vs verify).
  4. Do not sign without a measured 6-8 week pilot against baseline.
  5. OCL is an autonomous TMS with computer use; typical 5-7% freight recovery.

Want to apply this checklist to your stack?

In a demo we map your Excel/TMS and build a 6-8 week pilot with hours and 5-7% recovery as the north star.

Related reading

Frequently asked questions