If your operation exceeds 300 shipments per month, manual capture is no longer 'discipline': it is the most expensive product nobody budgeted. This playbook gets you out of capture, chase, and sample in 6-8 weeks.

Fits with complement or replace, the computer use pillar, and the fake freight digitization thesis. Not a day-one CargoWise/Magaya/SAP replacement: it is stopping manual data entry into them.

Who it is for (300+ shipments/month)

Shippers and 3PLs that today look like this:

  • Dozens of carriers in the network.
  • WhatsApp tracking.
  • Sample audit.
  • TMS or Excel that only reflects what was captured yesterday.

If you run your own fleet, OCL also covers fleet, workshops, and dynamic last-mile routing — this playbook still applies; the center is the file with agents, not “third-party freight only.”

Week 0: honest baseline

Elige un paso para ver el detalle

Detalle del paso · 01

Hours/week on capture and status

Data 1

Traffic + CS + AP; be brutally honest.

Weeks 1-2: one flow only

  • Pick one lane (e.g. Querétaro–Laredo) or one customer.
  • Freeze scope.
  • Define GPS alert rules, audit checklist, and owners.
  • Inventory mirror accounts for carriers on the flow.

Supports: GPS 10-min alert, four-source audit.

Weeks 3-6: agents live

  1. Assignment

    Agent contacts; your team decides exceptions.

  2. Tracking

    GPS mirrors; <10 min alert with owner.

  3. POD

    Evidence via dock, app, or WhatsApp.

  4. Audit

    Match CFDI, Carta Porte, GPS, and POD.

Do not expand to the whole network mid-pilot. That kills measurement.

Weeks 7-8: scale decision

Result vs baselineDecision
Capture hours ↓ and audit coverage ↑Scale to next lane/customer
High alert noiseTune rules two more weeks
No material changeReview input data / carrier adoption

Typical audit recovery when leaving sampling: 5-7% of spend in the audited universe.

Risks and how not to sabotage the pilot

  • Changing scope every week.
  • Not granting mirrors.
  • Paying outside the file.
  • Asking the agent to be a PAC.
  • Measuring 'happiness' instead of MXN and hours.

Related reading

Key takeaways5 points
  1. Goal: stop capture as the main job, not decorate the TMS.
  2. 6-8 week pilot on one measurable flow.
  3. Keep the system of record; add computer use to execute.
  4. Metrics: hours, audit coverage, alerts, MXN, OTIF.
  5. Natural CTA at 300+ shipments/month.

Frequently asked questions

If your team lives in capture and you move 300+ shipments/month, book the 6-8 week pilot and see agents on real shipments.

See agents on real shipments