Tendering freight means asking several carriers for structured quotes on the same information base: lanes, volumes, units, windows, and accessorial rules. A well-built RFQ (Request for Quotation) cuts transport spend 5–12% in the first round; a poorly built one produces aggressive base rates recovered through accessorials for the whole contract.

Golden rule: tender expected cost per shipment, not linehaul rate alone. This guide covers data, accessorials, total-cost modeling, carrier validation, and post-award audit.

savings, good RFQ
5–12%
carriers per pack
5–8
not base rate only
Total
leakage without audit
6–12 m

Cluster: cost per kilometer · charges dictionary · audit an invoice · free diagnostic.

Build the data pack

Per lane include: exact origin-destination, monthly volume and seasonality, unit type, typical weight and cube, load/unload windows, appointment and evidence (POD) requirements.

Five steps of a serious RFQ

Select a step to see detail

Step detail · 01

Data

Pack

Lanes, volume, unit, windows, appointments.

Elige un paso para ver el detalle

Detalle del paso · 01

Exact OD + reference km

Exact OD + reference km
Minimum pack per lane

Accessorial rules IN the RFQ

The costliest error: tender linehaul only and “see later” on accessorials. Every concept in the charges dictionary must be quoted at the same table.

AccessorialFix in RFQRed flag
DetentionFree time + hourly rateLow base + high detention
HandlingIn/out and who loadsDoubles with transfer
ReconsignmentRate and causesNo event cap
False freightPositioning + %100% without GPS proof
Diesel indexCRE, band, symmetryNo written formula

Compare total cost, not rate

Per-lane model: base rate + expected accessorials (real history per 100 shipments) + failure cost (OTIF and retail chargebacks).

RFQ

Tender expected total cost

Base

Rate

lane · unit

Extras

History

events / 100

Failure

OTIF

chargebacks

Cost of missing SLA

Rule

Aggressive base + expensive detention = recovery strategy. Hear it at the table.

Source · OCL method · Shipper tender

Contrast each bid against cost per kilometer: rate below CPK is a red flag for accessorial recovery or hidden subcontracting.

Docks with fleet at the DC: real capacity the freight RFQ must reflect
A serious RFQ compares total cost at the table, not base rate on one slide.

Validate before award

RFC, SICT permit, policy verified with insurer, active references: the full checklist lives in ghost carrier validation. The best bid from a carrier that fails validation is not a bid.

Due diligence

Pre-award

  1. RFC

    69-B clean

  2. SICT

    Live permit

  3. Policy

    With insurer

  4. Refs

    Active now

Close with audit

Tender sets price; audit defends it. Without invoice-by-invoice reconciliation to the awarded rate card, savings evaporate in 6–12 months through accessorial drift and misapplication.

Consistent finding in our 100-invoice diagnostics. Manual method: how to audit a freight invoice. Automated: Audit Agent.

What OCL runs on tender

OCL Cargo is an autonomous shipper-side TMS. The RFQ rate card becomes rules for the Audit Agent: every invoice reconciles to award before pay (audit before pay). It uses automated screen control (computer use) on portals when there is no integration. It can stamp invoice and Carta Porte when applicable. It coexists with procurement and operations: humans negotiate the RFQ, agent defends price invoice by invoice.

6–8 week pilot

Take 100 post-tender invoices. Baseline: drift vs awarded rate card, MXN in uncontracted accessorials, and clarification hours. Agent audits 100%; accounts payable only sees exceptions. Pattern when auditing 100%: recover 5–7% of spend when tender cut base but raised accessorials on invoice.

Elige un paso para ver el detalle

Detalle del paso · 01

Average drift vs awarded rate card

Average drift vs awarded rate card
RFQ pilot metrics
Key takeaways5 points
  1. Serious RFQ: same lanes, volumes, units, and rules for everyone.
  2. Tender expected total cost: base + historical accessorials + OTIF/chargeback cost.
  3. Accessorials at the table: detention, handling, reconsignment, diesel index.
  4. Validate RFC, SICT, policy with insurer before signing.
  5. Tender sets price; audit defends it (5–7% pattern).

Did your last tender cut rate and raise accessorials on invoice?

In a diagnostic we review your last RFQ vs real invoices: accessorial drift, CPK, and validation of awarded carriers.

Related reading

Frequently asked questions