A yard bottleneck is the lowest-capacity step in the whole flow: it sets how many units per day you can process, no matter how fast everything else is. Find it by observing where units pile up, measuring real capacity of each step, protecting the limiting step, and remeasuring after every change.

steps
4
before the constraint
Queue
at bottleneck = 1 h yard
1 h
every change
Remeasure

Investing in any step that is not the limiter improves that area’s report and does not move yard results.

Cluster: check-in · detention · tower.

Step 1: where the queue forms

Gate, hold with free docks, in front of busy docks, or loaded without exit: each pile-up points to a different constraint.

Where the queue forms

The pile-up is the yard’s most honest symptom.

Pile-upLikely constraint
Outside the gateSlow check-in or bad appointment mix
Hold with free docksAssignment: nobody calls to dock
In front of busy docksHandling or forklifts / labor
Loaded not exitingDocumentation or release
Source · Theory of constraints · MX yard

Step 2: measure capacity

Units per hour and idle time by stage, with real interruptions. The lowest effective capacity is your constraint.

Four-step method

Observe, measure, protect, remeasure. The constraint moves.

Select a step to see detail

Step detail · 01

Observe

Where it piles

Walk peak hour. The queue forms before the constraint.
An hour lost at the bottleneck is an hour lost for the whole yard.
Line of trailers at DC docks during peak hour
Every yard “needs another dock” until someone measures and finds the dock waiting on forklifts.

Step 3: protect the constraint

Work buffer, subordinate to bottleneck pace, and keep foreign work off the limiting step.

How to protect the constraint

Investing in any other step improves the area report, not the yard.

01

Buffer

Always a unit ready before the prior one finishes.

02

Subordinate

Gate does not release more than the constraint digests.

03

No foreign work

The limiting dock does not wait on paperwork: paperwork arrives early.

Source · Goldratt · yard application

Step 4: did it move?

If you sped unload and units now wait on paperwork, the constraint moved. Related: check-in, release.

What OCL runs

OCL Cargo is an autonomous TMS with agents and computer use (operating screens and portals like an analyst). It builds the trip file per shipment, cross-checks evidence, and leaves exceptions to humans. It coexists without a day-one TMS migration. OCL can stamp invoice and Carta Porte. On the Mexico–US corridor, the value is closing the trip file before paying.

Trip file

Flow control

  1. Observe

    Queue

  2. Measure

    Capacity

  3. Protect

    Bottleneck

  4. Remeasure

    Moved

6–8 week pilot (yard)

One peak week: pile-up map, capacity by stage, and a bottleneck-protection experiment. Goal: more units/day without new construction.

Elige un paso para ver el detalle

Detalle del paso · 01

Peak-hour walk with queue map

Peak-hour walk with queue map
Pilot checklist
Key takeaways5 points
  1. The bottleneck is the lowest-capacity step in the flow.
  2. The queue forms before the constraint.
  3. Measure observed capacity, not theoretical.
  4. An hour lost at the bottleneck is an hour lost for the whole yard.
  5. Every improvement moves the constraint: measure again.

Does your yard “need another dock,” or does it need a stage-by-stage measurement?

Related reading

Frequently asked questions